09. May 2018 · Comments Off on Projects · Categories: Domestic

Well, a project progress report, seeing that one of the semi-big projects on my list of home-improvement items has been accomplished – and bountifully, at that. Well, it did run to about $300 more in labor and $200 more in stuff – specifically a wall-mounted mirror, a faucet set, and a glass shelf – than I had initially anticipated. But the small bathroom renovation is complete and gorgeous! Well, once the glass shelf arrives, courtesy of Amazon and UPS, it will be complete. I began working on the bathroom after I got back from Houston, at the middle of April – scraping disgusting wads of soluble plaster and popcorn texture off the ceiling, and alternately, those last bits of paint from off the concrete floor, while awaiting the convenience of Neighborhood Handy Guy. Neighborhood Handy Guy boogies to the beat of a different drummer, when it comes to a schedule, I’m afraid. When he says, “I’ll be over first thing!” it could mean anywhere between 8:30 and noon. When he says, “I’ll be over today!” it could be any time from mid-morning to late afternoon. This charming eccentricity is forgiven by neighborhood clients because he does amazingly good work (carpentry, tile-work, fixture-installation, painting, etc.) being a perfectionist at heart, and that his charges for labor are … well, let’s just say they are reasonable. Especially if you do some of the work, assist him, and purchase the necessary. So reasonable that he is in constant demand – another reason for being patient. So – two weeks of work from Neighborhood Handy Guy, including trips to the local Lowe’s outlet, first to pick up the pedestal sink and the new toilet, the paint, tile for floor and sink surround, good sturdy planks for a shelving unit, baseboards and trim, subsequently to collect other items as required … and now the bathroom is finished. Yay! (Pictures below. The room is so small that it’s impossible to back up far enough to take pictures encompassing the whole … and the paint color is more of a white with a pink tinge than the sort of Pepto Bismol shade that it looks under flash.)

It’s amazing how much roomier it seems, now with a nice pedestal sink, and with a custom, if simple and unadorned shelving unit installed. The original vanity was contractor-grade, and so shoddy that I bashed it apart myself with an ordinary hammer and consigned it to the gargantuan wheelie-trash-bin without any untoward exertion. And my place was built by a reputable company: homes built by the really fly-by-night builders must be equipped with cabinets built with heavy cardboard, and fixtures constructed from soda straws and heavy tinfoil.

It’s only the very first item on my Five-Year To-Do, though. I am awaiting the call from the roofing and remodeling company, in service to the second item – initial construction of the Catio and in association with that project, a new roof. Sometime in late May, early June, I think. Then the garage door – and that is dependent on sorting out all the crap in the garage, much of which is the Daughter Unit’s. She came home from her last station at Cherry Point and when her hold baggage arrived, it was all unloaded into the garage. The master bath reno must wait until after Christmas. Sigh. Another week of scraping popcorn gunk off the ceiling awaits me at that point. And likely at least three weeks of waiting every day for Neighborhood Handy Guy to appear and work his home-renovation magic. Until then, I solace myself by going down the hall, opening the door, and basking in the retro-charm of the finished small bathroom.

02. May 2018 · Comments Off on My Garden in May · Categories: Domestic, Uncategorized

So – given the principle that a picture is worth a thousand words, here is a lengthy post of pictures, taken today in my tiny suburban garden/farm:

All righty, then — A Half Dozen of Luna City is put to bed, both print and ebook versions! The sixth Luna City chronicle goes on sale on the 30th of this month, although the Kindle version will soon be available for pre-order! – from the back cover blurb:

Welcome to Luna City, Karnes County, Texas … Population 2,456, give or take … Business at the Luna Café & Coffee is looking up for fugitive former celebrity chef Richard Astor-Hall. The owners – elderly schoolteacher Miss Letty, and the irascible Doc Wyler have approved hiring another cook and expanding hours at the Café. Joe Vaughn, chief of the tiny Luna City Police Department, is coping with the demands of parenthood … and both he and local ace reporter Kate Heisel are deep into untangling the mystery of a very old skeleton unearthed in construction of a brand-new facility at Mills Farm, the upscale resort just down the road.

23. April 2018 · Comments Off on Markets and All · Categories: Random Book and Media Musings

The Daughter Unit and I are looking ahead already, although it is still technically spring and so a bit early, one might assume, to start planning our marketing season. We have historically done a lot of business in the last quarter of the year, a matter in which we have a lot in common with fixed-location retailers. No, it is not too early; these sorts of things take lots of planning on the part of organizers. I have already sent in an application for the Giddings Word Wrangler, for example – an event which won’t happen until September. I have already gotten a communication from the organizers of the New Braunfels Weinachstmarkt – something that won’t happen until November, and this year, will happen without me. They have decided to drop the Texas Author Hall and convert the spaces in the corridor of the Civic Center (previously available for a reasonable sum to writers and publishers) to regular vendor booths. Which cost several times what we are prepared to shell out, even for a three-day-long event – so, that’s another weekend to fill, in the Christmas shopping season.

There is word through the Texas Association of Authors, of a street festival/market in Comfort, in October or so, which might prove interesting to pursue. There is twice-yearly market in Bulverde, which has always been good to us – and at a reasonable table fee, which is made even better for the two of us being able to split it: my books, the Daughter Unit’s origami art. The Bulverde C of C, though – has had to find another site for their market, as the strip-mall parking lot formerly used now has too many popular businesses along the fringe … so they have cancelled the Spring market, and hope to go all out in the Fall, in a new location. The Author Corral in Goliad has always been good for me – save that one year when the temperatures dropped into the low Twenties with strong winds pushing the temperatures even lower. Yes – that was particularly horrible, for everyone, but as there is no charge for the Author Corral, all we were out was time and gas.

Last year we were contemplating Dickens on Main in Boerne; an evening event and rather pricy as these things go, but the few regular monthly markets we ventured in Boerne did not pan out as well as expected, and we were too late to get a place at the Johnson City Courthouse lightening. Johnson City only charged a small fee – but we had to stay two nights at an RV park, rather than risk an hour drive late at night, what with drunks and suicidal deer on the roads. When you have to factor in hotels and meals, there is a whole ‘nother dimension to the gypsy markets. And why haven’t we done more San Antonio markets, pray tell? Why are we put to the effort of driving miles and miles? Honestly, I’d love to do an event that’s only ten minutes away, but most of the big San Antonio Christmas events charge vendors way too much for a table. Even something juried and focusing on art by the creators of it, like Gruene charge a bomb for participation, which is nice for those artists asking substantial sums for their original work – but not so remunerative for my daughters’ work, which is usually two figures or less. So that’s how the situation stands; I am looking to do more events like the Texas State Historical Association, and my daughter to those juried art fairs which don’t ask much for their tables or booth space. More about events that we will be participating in, as the schedule firms up.

19. April 2018 · Comments Off on 5-Year Plan: The First Project · Categories: Domestic

While waiting to be put into the roofing/construction company’s schedule for the ‘catio’ and the new roof – which likely won’t happen until mid or late May at earliest, I have gone ahead and started work on the small bathroom renovation. The Daughter Unit was expecting this to be done while she was in California. I was also expecting to have Roman the Handy Guy start on the ‘catio’ before she even left, but he was in two minds about the project; an entirely roofed and screened-in porch was a bit more of a project that he wanted to tackle single-handed. So – I handed off the catio-porch element onto the professionals and asked him to tackle the small bathroom renovation. This is something more in his wheelhouse anyway.

The small bathroom project is a relatively simple one; rip out the vanity/sink and the toilet, scrape that nasty popcorn texture off the ceiling, tile the floor and the wall behind where the new sink will go, repaint the whole room, and install a set of built-in shelves and a new wall light fixture. The whole room is about 5 by 9, a third of that taken up by the bathtub across one end anyway. No big structural changes, no changes to the water or sewer lines, nothing to the electrical beyond replacing switch plates to match the new color scheme. Which will be white and a sort of grey-lavender-pinkish, to match a little vintage porcelain dresser set that the Daughter Unit picked up somewhere or other and wanted to use as the keynote design element. We plan to reuse the faucet set – since it was the one that I bought to replace the original construction-grade faucet about a decade ago, when I did my first redecorating pass through my little patch of suburban paradise.

So, yesterday we were at the local big-box home renovation store, picking up the replacement toilet and pedestal sink that I had ordered last week – both items packed in big boxes, which is why I had arranged with Roman and his pickup truck, rather than try and stuff them in the back of the Montero myself. While there, I bought the other material for the project; paint, floor and backsplash tile, the grout mix, lengths of baseboard stock, and lumber for a set of floor-to-ceiling shelves which will replace the storage space lost when the bathroom vanity is taken out. The bathroom is so small, the vanity takes up entirely too much of what little space there is – hence, replaced with a pedestal sink. Roman has a busy schedule for the rest of this week, so his part of the renew-work falls into next week. My part falls into the interim: scrape up the last of the paint on the concrete floor and clean thoroughly, so that the tiles adhere properly, take down all the stuff attached to the walls, patch the holes, sand, and otherwise prep the room for heavy redecoration. And that was my week – other than the trip to Houston, which I will write up anon.