While waiting to be put into the roofing/construction company’s schedule for the ‘catio’ and the new roof – which likely won’t happen until mid or late May at earliest, I have gone ahead and started work on the small bathroom renovation. The Daughter Unit was expecting this to be done while she was in California. I was also expecting to have Roman the Handy Guy start on the ‘catio’ before she even left, but he was in two minds about the project; an entirely roofed and screened-in porch was a bit more of a project that he wanted to tackle single-handed. So – I handed off the catio-porch element onto the professionals and asked him to tackle the small bathroom renovation. This is something more in his wheelhouse anyway.
The small bathroom project is a relatively simple one; rip out the vanity/sink and the toilet, scrape that nasty popcorn texture off the ceiling, tile the floor and the wall behind where the new sink will go, repaint the whole room, and install a set of built-in shelves and a new wall light fixture. The whole room is about 5 by 9, a third of that taken up by the bathtub across one end anyway. No big structural changes, no changes to the water or sewer lines, nothing to the electrical beyond replacing switch plates to match the new color scheme. Which will be white and a sort of grey-lavender-pinkish, to match a little vintage porcelain dresser set that the Daughter Unit picked up somewhere or other and wanted to use as the keynote design element. We plan to reuse the faucet set – since it was the one that I bought to replace the original construction-grade faucet about a decade ago, when I did my first redecorating pass through my little patch of suburban paradise.
So, yesterday we were at the local big-box home renovation store, picking up the replacement toilet and pedestal sink that I had ordered last week – both items packed in big boxes, which is why I had arranged with Roman and his pickup truck, rather than try and stuff them in the back of the Montero myself. While there, I bought the other material for the project; paint, floor and backsplash tile, the grout mix, lengths of baseboard stock, and lumber for a set of floor-to-ceiling shelves which will replace the storage space lost when the bathroom vanity is taken out. The bathroom is so small, the vanity takes up entirely too much of what little space there is – hence, replaced with a pedestal sink. Roman has a busy schedule for the rest of this week, so his part of the renew-work falls into next week. My part falls into the interim: scrape up the last of the paint on the concrete floor and clean thoroughly, so that the tiles adhere properly, take down all the stuff attached to the walls, patch the holes, sand, and otherwise prep the room for heavy redecoration. And that was my week – other than the trip to Houston, which I will write up anon.
Recent Comments